|
Product Detail :
|
(1)Proposed TRR(P) at 1)kms 864.100-865.600=1.500kms Down Road,2)kms
867.242-868.139=0.897 kms DownRoad,3)kms.808.500-810.000=1.500kms
UPRoad,4) kms 810.600-814.400=3.800 kms UpRoad, G.Total kms=7.697kms in
between Itarsi-Narkher section. (2)Proposed TFR(E) (A) Itarsi-Nagpur
section=118.258 Kms, (B)Amla-Chhindwara section=31.678 kms,
G.Total=149.936kms under DEN(N)NGPs jurisdiction. (3)Standarisation of
formation width G.Total=19.657 kms under DEN(N)NGPs jurisdiction. (4)(i) Casual
renewal of rails=3.33 kms,(ii) Casual renewal of sleepers=3.33 kms and (iii) Casual
renewal of Glued joints=97nos under DEN(N)NGPs Jurisdiction. (5)Itarsi-Narkher-
CTR(P)-12.011Km,CTR(S)-1.548km(Passenger running Loop Lines).
|
| Tender Detail : |
(1)Proposed TRR(P) at 1)kms 864.100-865.600=1.500kms Down Road,2)kms
867.242-868.139=0.897 kms DownRoad,3)kms.808.500-810.000=1.500kms
UPRoad,4) kms 810.600-814.400=3.800 kms UpRoad, G.Total kms=7.697kms in
between Itarsi-Narkher section. (2)Proposed TFR(E) (A) Itarsi-Nagpur
section=118.258 Kms, (B)Amla-Chhindwara section=31.678 kms,
G.Total=149.936kms under DEN(N)NGPs jurisdiction. (3)Standarisation of
formation width G.Total=19.657 kms under DEN(N)NGPs jurisdiction. (4)(i) Casual
renewal of rails=3.33 kms,(ii) Casual renewal of sleepers=3.33 kms and (iii) Casual
renewal of Glued joints=97nos under DEN(N)NGPs Jurisdiction. (5)Itarsi-Narkher-
CTR(P)-12.011Km,CTR(S)-1.548km(Passenger running Loop Lines). |