Product Detail :
|
Annual Rate Contract of Civil Work for West Zone Vmc. , Earth Work (executed with Mechanised Efforts/ Machinaries, Excavation for Foundation Upto 1.5 M Depth Including Sorting, Out and Stacking of Useful Materials and Disposing Off the, Excavated Stuff Upto 50 Meter Lead.(a) Loose Or Soft Soil, Excavation for Foundation Upto 1.5 M Depth Including Sorting, Out and Stacking of Useful Materials and Disposing Off the, Excavated Stuff Upto 50 Meter Lead.(b) Dense Or Hard Soil, Excavation for Foundation Upto 1.5 M Depth Including Sorting, Out and Stacking of Useful Materials and Disposing Off the, Excavated Stuff Upto 50 Meter Lead.(c) Hard Murrum, Excavation for Foundation Upto 1.5 M Depth Including Sorting, Out and Stacking of Useful Materials and Disposing Off the, Excavated Stuff Upto 50 Meter Lead.(d) Soft Rock Not, Requiring Blasting, Excavation for Foundation Upto 1.5 M Depth Including Sorting, Out and Stacking of Useful Materials and Disposing Off the, Excavated Stuff Upto 50 Meter Lead.(e) Hard Rock, Excavation for Foundation for Depth From, 1.5 M to 3.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(a) Loose Or Soft Soil, Excavation for Foundation for Depth From, 1.5 M to 3.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(b) Dense Or Hard Soil, Excavation for Foundation for Depth From, 1.5 M to 3.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(c) Hard Murrum, Excavation for Foundation for Depth From, 1.5 M to 3.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead. (d) Soft Rock Not Requiring Blasting, Excavation for Foundation for Depth From, 1.5 M to 3.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(e) Hard Rock, Excavation for Foundation for Depth From, 3.0 M to 5.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(a) Loose Or Soft Soil, Excavation for Foundation for Depth From, 3.0 M to 5.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(b) Dense Or Hard Soil, Excavation for Foundation for Depth From, 3.0 M to 5.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing of the Excavated Stuff Upto 50, Meter Lead.(c) Hard Murrum, Excavation for Foundation for Depth From, 3.0 M to 5.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter Lead.(d) Soft Rock Not Requiring Blasting, Excavation for Foundation for Depth From, 3.0 M to 5.0 M Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50, Meter, Lead.(e) Hard Rock, Extra for Additional Depth More Than 5.0 M for Excavation for, Foundation Including Sorting Out and Stacking of Useful, Materials and Disposing of the Excavated Stuff Upto 50 M, Lead.(a) Loose Or Soft Soil, Extra for Additional Depth More Than 5.0 M for Excavation for, Foundation Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50 M, Lead.(b) Dense Or Hard Soil, Extra for Additional Depth More Than 5.0 M for Excavation for, Foundation Including Sorting Out and Stacking of Useful, Materials and Disposing of the Excavated Stuff Upto 50 M, Lead.(c) Hard Murrum, Extra for Additional Depth More Than 5.0 M for Excavation for, Foundation Including Sorting Out and Stacking of Useful, Materials and Disposing Off the Excavated Stuff Upto 50 M, Lead.(d) Soft Rock Not Require Blasting, Extra for Additional Depth More Than 5.0 M for Excavation for, Foundation Including Sorting Out and Stacking of Useful, Materials and Disposing of the Excavated Stuff Upto 50 M, Lead.(e) Hard Rock, Add Extra for Disposing Off the Excavated Stuff of Above, Items for Lead of (a) 50 M to 100 M, Add Extra for Disposing Off the Excavated, Stuff of Above Items for Lead of (b) 100 M to 200 M, Add Extra for Disposing Off the Excavated Stuff of Above, Items for Lead of (c) 200 M to 300 M, Add Extra for Disposing Off the Excavated Stuff of Above, Items for Lead of (d) 300 M to 400 M, Add Extra for Disposing Off the Excavated, Stuff of Above Items for Lead of (e) 400 to 500 M, Filling Available Excavated Earth (excluding Rock) in, Trenches. Plinth, Sides of Foundations Etc. in Layers Not, Exceeding 20 Cm. in Depth Consolidating Each, Disposited Layer By Ramming and Watering., Filling in Plinth with Sand Under Floors Including Watering, Ramming, Consolidating and Dressing Complete, Filling in Foundation and Plinth with Murrum Or Selected Soil in, Layers of 20cm. Thickness Including Watering, Ramming and, Consolidating Etc. Complete., Filling in Foundation and Plinth with Brick Bats Chhara in
|