| Sector | abcRailways Transport Services | Tender Value | N.A. | Location | Bihar - India | Ref.No | 85172749 | Closing Date | 28 - Jul - 2025 | | | Manufacture and Supply of 1 in 8.5 Diamond Crossing with Single Slip (Curved
Switch) BG for 60 Kg Rails on PSC Sleepers layout complete with 7000 mm Over
Riding Curved Switches to RDSO Drg. No. T-6493 Alteration 2/(Latest Alteration) and
Specification IRS T-10-2025 & CMS Acute Crossings to RDSO Drg. No. T-4967- 02
Nos/Latest Alteration, CMS Obtuse Crossings to RDSO Drg. No. T-6495 - 02
Nos/Latest Alteration and Specification IRS T-29 (Revised 2024), STR TDG - 0021
Version 2.0 for CMS Crossings with Latest revision/corrigendum/amendment
complete with all parts listed in the sub assembly RDSO Drg. No. T-6493 but
excluding Standard Fish Plates, Fish Bolts, Elastic Rail Clips, Insulating Liners/Metal
Liners as amended up-to date of closing of e- tender. List of fittings as per Annexure-
B Note- Rails needed for fabrication purpose has to be arranged by Supplier at his
own cost in terms of Railway Boards Letter No. 2022/Track-1(P)/Fabricators dt.
24.01.2022. for fabrication purpose has to be arranged by Supplier at his own cost
in terms of Railway Boards Letter No. 2022/Track-1(P)/Fabricators dt. 24.01.2022. . * Manufacture and Supply of 1 in 8.5 Diamond Crossing with Single Slip (Curved Switch) BG for
60 Kg Rails on PSC Sleepers layout complete with 7000 mm Over Riding Curved Switches to RDSO Drg. No.
T-6493 Alteration 2/(Latest Alteration) and Specification IRS T-10-2025 & CMS Acute Crossings to RDSO Dr
g. No. T-4967- 02 Nos/Latest Alteration, CMS Obtuse Crossings to RDSO Drg. No. T-6495 - 02 Nos/Latest Alt
eration and Specification IRS T-29 (Revised 2024), STR TDG- 0021 Version 2.0 for CMS Crossings with Late
st revision/corrigendum/amendment complete with all parts listed in the sub assembly RDSO Drg. No. T-64
93 but excluding Standard Fish Plates, Fish Bolts, Elastic Rail Clips, Insulating Liners/Metal Liners as amend
ed up-to date of closing of e- tender. List of fittings as per Annexure- B Note- Rails needed for fabrication p
urpose has to be arranged by Supplier at his own cost in terms of Railway Boards Letter No. 2022/Track-1(
P)/Fabricators dt. 24.01.2022. [ Warranty Period 30 Months after the date of delivery ] ] |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|